Shadraak
New Member
- Messages
- 526
- Location
- Indiahoma, Oklahoma
Well figured i'd do a step by step of my 92qt tub setup for my 3 female cresties to go in.. takign pics each step, will finish it tonight, only problem will be decorating it so it'll be pretty bare to begin with bu then will get better, onlything i hate is that bamboo, or water reed, whichever it is, id ont think is waterproof, and i had glued one piece in hope it doesn't mildew the others did but i doused in hand sanitizer and it stopped it now, so hopefully that's all it was..
How it will look after holes are done:
After holes were drilled and screened:
it broke on 2 in the front, but i got it covered and everythign seems ok for now, went with sides with 2 holes and 5 in front, nothing in back as that's how it'll face, hopefully it'll vent correctly if not i can do more 1/4" holes along the top.. but that's it for now, i'll let that dry, and trim screen when i go back tonight, then try to decorate and wash out the tub..which will be next pics.
How it will look after holes are done:
After holes were drilled and screened:
it broke on 2 in the front, but i got it covered and everythign seems ok for now, went with sides with 2 holes and 5 in front, nothing in back as that's how it'll face, hopefully it'll vent correctly if not i can do more 1/4" holes along the top.. but that's it for now, i'll let that dry, and trim screen when i go back tonight, then try to decorate and wash out the tub..which will be next pics.