Pro Geckos
professionalreptiles.com
- Messages
- 261
- Location
- NV
I’m planning on making some new racks soon and have a few heating questions.
I know with the AP racks and several others they use one long strip of flexwatt that weaves through each level. Would this be the best way or would it be better to cut each tape to the length needed and wire them parallel?
Another thing is because heat rises my concern is that with a tall rack (6 ft.) the top will be to hot and the bottom too cold if controlled off one thermostat. What is everyone’s experience with this? I’m thinking of controlling the top and bottom independently of one another. Thanks for the help!
I know with the AP racks and several others they use one long strip of flexwatt that weaves through each level. Would this be the best way or would it be better to cut each tape to the length needed and wire them parallel?
Another thing is because heat rises my concern is that with a tall rack (6 ft.) the top will be to hot and the bottom too cold if controlled off one thermostat. What is everyone’s experience with this? I’m thinking of controlling the top and bottom independently of one another. Thanks for the help!
